Ditches and drains construction

  

For a ditch construction a trench is dug with an excavator, which transverse section size maximally suits the sizes required in project documentation.With «extra» soil falling out on trench bottom, the trench edges are formed. Soil on the bottom of trench is slightly rammed. On the trench bottom and slopes dorrnit or another unwoven geo-textile linen is laid. With a faucet UFPCM are piled into the prepared trench close to each other, so that concrete elements form the section of trench or flow according to Scheme 

Chanel constructing with UFPCM